The bottleneck isn’t compute or capital, it’s power that’s ready to run. We acquire live power and operate the capacity for AI tenants.
From acquired site to operating capacity
01
Acquire
Energized industrial sites with live interconnection, ready to carry AI load.
02
Energize
Concurrently maintainable power and cooling, fiber and water paths, designed for Tier III.
03
Operate
One counterparty from substation to SLA, operating the capacity for AI tenants.
Demand is outpacing what the grid can deliver. The scarce asset is no longer capital or silicon. It is energy that is live, permitted, and ready now.
$600B+
Hyperscaler AI CAPEX 2026 (Est)
2%
National colocation vacancy, or less
$150K
Foregone per megawatt, per month of delay
The engine
Energized acquisition
Power that is live today. The megawatts are already connected.
We acquire energized industrial sites with live interconnection and repurpose the power for AI. The capacity is already connected to the grid, so it is available from the day we take ownership.
01
Acquire energized, interconnected sites
02
Recover capital from existing infrastructure
03
Tier III conversion available from day one